AKALM Completed Projects

A selection of flagship projects where AKALM support systems, anchors, and fastening solutions were used: metro and transport, automotive, medical, data centers, semiconductors, industrial facilities, pumped-storage hydro, commercial, entertainment, and aviation manufacturing.

← AKALM Catalog

Beijing Metro Line 3
Metro & Transport

Beijing Metro Line 3

Year: 2023 · Scale: 37.4 km, 27 underground stations

East–west trunk line of the Beijing Subway, 37.4 km long with 27 underground stations. AKALM support systems were used for MEP routing in the confined space of the station structures.

Project details
General ContractorBeijing Urban Construction Group
ApplicationStation concourses, platforms and equipment corridors
ChallengeLimited working space with dense, intricate pipe lines in the underground stations.
SolutionBIM-driven detailing with advance spatial planning ahead of installation.
BMW NEX Test Line
Automotive

BMW NEX Test Line

Year: 2022 · Scale: 2,840,000 m²

BMW NEX (Neue Klasse) pilot line for pre-production testing of new models at the Shenyang facility, preparing for 2025/2026 series production start.

Project details
General ContractorChina Automobile Industrial Engineering Co., Ltd.
ApplicationStamping & Welding Shop
ChallengeHeavy concentration of pipelines along the pilot line.
SolutionA custom solution compensating for embedded-part position deviation.
Audi Changchun (BEV plant)
Automotive

Audi Changchun (BEV plant)

Year: 2023 · Scale: 2,460,000 m²

Audi's all-electric vehicle plant in Changchun (PPE platform): 154 ha, carbon-neutral, 150,000 vehicles/year capacity, with 35M kWh of on-site solar generation.

Project details
General ContractorJilin Installation Group Co., Ltd.
ApplicationStamping & Welding Shop
ChallengeLarge-span steel structure.
SolutionMaximized use of the existing structure with a new substructure.
BYD Chengdu (chip & new energy)
Automotive

BYD Chengdu (chip & new energy)

Year: 2024 · Scale: 300,000 m²

BYD's chip and new-energy base in Chengdu: supporting 220kV power-supply infrastructure and 9.1 km of new lines.

Project details
General ContractorCEFOC
ApplicationFM Fire Protection
ChallengeComplex site conditions making installation difficult.
SolutionPrefabricated supports with BIM clash avoidance.
CNNC Cancer Hospital, Changsha
Medical

CNNC Cancer Hospital, Changsha

Year: 2025 · Scale: 20,000 m²

CNNC Cancer Hospital in Changsha — Hunan province's regional benchmark for nuclear medicine and a key public livelihood project.

Project details
General ContractorHunan Construction Engineering Group
ApplicationMEP pipelines
ChallengeMultiple systems with dense pipe runs requiring physical separation and ultra-high cleanliness.
SolutionHigh-precision adjustable brackets with BIM coordination.
Huawei Data Center
Data Centers

Huawei Data Center

Year: 2022 · Scale: 20,000 m²

Huawei Grade-A data center — a core benchmark facility for the national computing network, high-reliability and low-carbon.

Project details
General ContractorSCEGC No.8 Construction Group
ApplicationMEP pipelines
ChallengeHeavy load, numerous pipelines and limited space.
SolutionA combination of heavy-duty and medium-duty support systems.
3rd-Gen Semiconductor Base, Shenzhen
Semiconductors

3rd-Gen Semiconductor Base, Shenzhen

Year: 2023 · Scale: 100,000 m²

Shenzhen's 3rd-generation wide-bandgap semiconductor material production base, built by CSCEC 2nd Bureau.

Project details
General ContractorChina Construction Second Engineering Bureau Co., Ltd.
ApplicationSeismic support brackets
ChallengeHigh floor height and complex pipeline layout.
SolutionSecondary support platforms anchored to structural columns for seismic performance.
Apple Asia R&D Center
Industrial Facilities

Apple Asia R&D Center

Year: 2026 · Scale: 5,000 m²

Apple's Asia R&D Center — the company's most comprehensive, highest-standard facility outside the US.

Project details
General ContractorInfinity Design and Engineering Limited
ApplicationData center, laboratory and office areas
ChallengeDensely arranged pipelines with large specifications.
SolutionA combination of medium-duty and heavy-duty systems.
Starbucks Kunshan, Phase II
Industrial Facilities

Starbucks Kunshan, Phase II

Year: 2022 · Scale: 30,000 m²

Starbucks Kunshan Phase II — the core of the Starbucks China Coffee Innovation Park, the company's largest overseas investment.

Project details
General ContractorShanghai YZJ Construction
ApplicationProduction plant
ChallengeLarge-span steel structure — support anchorage was difficult.
SolutionPrefabricated supports with a conversion anchoring structure.
Hubei Weijiachong Pumped Storage
Pumped-Storage Hydro

Hubei Weijiachong Pumped Storage

Year: 2026 · Scale: 298 MW, 330M kWh/year

Hubei Weijiachong pumped-storage plant: first unit online July 2026, cutting CO₂ emissions by 180,000 t/year.

Project details
General ContractorSinohydro Bureau 14 Co., Ltd.
ApplicationMain powerhouse
ChallengeHumid, corrosive conditions with low cleanliness; structural corrosion.
SolutionSandblasting with immediate coating, hot-dip galvanized parts.
Fuzhou IKEA Livat
Commercial & Retail

Fuzhou IKEA Livat

Year: 2020 · Scale: 110,000 m²

Fujian's first IKEA Livat complex — China's first IKEA mixed-use project.

Project details
General ContractorCSCEC Strait
ApplicationMEP pipelines
ChallengeMultiple systems with dense pipelines requiring physical separation and high cleanliness.
SolutionSupport systems with physical zoning of circuits.
Disney Triangle Hotel
Entertainment

Disney Triangle Hotel

Year: 2025 · Scale: 49,000 m²

A five-star hotel within the Disney resort: AKALM support systems were installed across all areas of the building, including the roof, with BIM coordination to minimize clashes.

Project details
General ContractorShanghai Construction Group Co., Ltd.
ApplicationAll areas of a five-star hotel, including the roof
Shenzhen LEGOLAND
Entertainment

Shenzhen LEGOLAND

Year: 2025 · Scale: 400,000 m²

A large theme park in Shenzhen: AKALM solutions were supplied for the main park zones and supporting infrastructure, including ductwork and fire-protection pipe routing.

Project details
General ContractorChina Construction Eighth Engineering Division Corp., Ltd.
ApplicationMain park zones and supporting infrastructure
C919 Final Assembly Complex
Aviation Manufacturing

C919 Final Assembly Complex

Year: 2025 · Scale: 490,000 m², spans up to 108.1 m

C919 Phase II Final Assembly & Integration complex (Shanghai FTZ): 361,600 m² (assembly 292,800 + parts warehouse 68,800), ¥7.125B investment, 936-day construction.

Project details
General ContractorCSCEC Shanghai Branch
ApplicationProduction workshops
ChallengeDense, heavy pipes in the tunnel; large-span complex steel — difficult anchoring.
SolutionOptimized heavy-duty supports and anchoring systems, BIM clash coordination and minimal welding.